Waterloo, ON

445 Anndale Road

PARTNERS

KPMB Architects

Janet Rosenberg & Studio

Hammerschlag & Joffe

BA Consulting Group

Mulvey & Banani

Arcadis

UP Consulting

Community-centred living

445 Anndale Road brings 55 thoughtfully designed, low-carbon rental homes to north Waterloo. A mix of two-storey townhouses and three-storey walk-up apartments offers a range of homes suited to individuals, couples, and growing families alike.

Built to low-carbon, energy-efficient standards, 445 Anndale Road is designed for the climate of the future, delivering comfortable, resilient homes with low operating costs and a reduced environmental footprint.

Steps from Anndale Park's trails, playground, and year-round outdoor recreation, and within easy reach of Conestoga Mall, the ION LRT, schools, and everyday amenities, the site offers convenience without compromise. Landscaped shared outdoor spaces and community gardens round out a connected, community-centred rental-living experience.

Proposal Highlights

55 low-carbon rental homes

Proximity to LRT station

Community gardens

Integrated Solar Panels

EV charging stations

Zero fossil fuel combustion on-site

project details

  • 445 Anndale includes one- two- and three-bedroom townhomes and apartments powered with high-efficiency, all-electric heat pump mechanical systems and high-performance building envelope for enhanced thermal comfort and lower heating demand. 
  • This site is steps away from the Contesoga LRT station, nearby shopping malls, recreation complexes, schools, and grocery stores. 
  • This project features a community garden and outdoor gathering spaces. Natural landscaping integrates local, resilient, drought-resistant vegetation that requires less water to maintain.
  • Integrated seamlessly with the surrounding community, the project offers pedestrian-safe spaces to ensure convenient access to community services.
  • Solar PV panels produce on-site renewable energy, with the potential to generate all the energy needed each year.
  • No fossil fuels are combusted on site, reducing direct emissions to zero. 

Timeline

Public Consultation

Q4 025

Site Plan Submission

Q4 2026

Construction

TBD

Occupancy

TBD

Q3 2025

Application Submission

Q3 2026

Zoning Approval

TBD

Site Approval Plan

TBD

Construction Complete

News

No items found.

property data

No items found.

FAQs

No items found.
Latest Updates

Construction Started

We Want To Hear From You

Part of being a good neighbour is keeping an open dialogue. If you have comments or feedback on this development, we would be happy to listen.